Fieldset
Santa Monica - Day 1
A Refugee Camp in the Heart of the City in Los Angeles

8 o’clock in the morning, the back doors of the truck open, the first boxes of material are lowered with the tail lift. In 6 hours, the MSF team will have finished installing the Refugee Camp exhibition in the parking lot next to Santa Monica Pier and world-famous Muscle Beach. We are ready to welcome visitors.

I’m often asked if the materials we use in the exhibition are the same we use in our projects. Yes, they are!

As a logistician, I’m attached to the MSF logistics system, which allows us to be operational in emergencies and crisis situations within 36 hours, anywhere in the world. We work with standardized kits, adapted to the needs of the field.